Build a system-wide utility schedule
List each equipment item and its required inlet and outlet conditions. Include stock preparation, pumps, agitation, forming, vacuum, drying or hot pressing, trimming, compressed air, cooling and water treatment where applicable. Confirm which supplier provides each interface.
Ask for units and operating bases. A statement of installed kilowatts does not tell you the monthly electricity bill; a thermal rating does not by itself establish fuel consumption. Identify continuous, intermittent and start-up loads and the expected simultaneity.
Separate electrical, thermal and fluid systems
| System | Information to request |
|---|---|
| Electricity | Connected load, running demand, starting conditions and supply requirements |
| Process heat | Heating medium, required conditions, control range and boundary of supply |
| Vacuum | Operating conditions, flow basis, filtration and distribution losses |
| Compressed air | Pressure, flow, quality and receiver requirements |
| Water | Fresh make-up, circulation, quality, cooling and discharge assumptions |
| Effluent | Expected streams and the site-specific treatment assessment |
Balance water instead of assuming zero discharge
Show process water entering, circulating within and leaving the system. Account for moisture in products and rejects, cleaning and any purge or treatment stream. Recirculation does not automatically mean that no fresh water or treatment is required.
Assess the proposed furnish, additives and process conditions with the water-treatment and plant teams. Space and access for tanks, maintenance and cleaning should be visible on the layout. Confirm any discharge arrangement and applicable site requirements with qualified advisers.
Define layout and safety responsibilities
Check equipment access, lifting arrangements, pipe routes, electrical segregation, heat exposure, ventilation and safe operator movement. Thermal equipment, pressure systems and electrical installations need competent engineering and the relevant approvals. This planning guide does not provide construction drawings or a safety certification.
Use an interface register with an owner for each connection. It should identify the utility source, supply conditions, connection point, instrumentation, commissioning checks and the party responsible for proving readiness.
Evaluate energy options against the load
Measure the useful process demand before comparing fuels or renewable-energy options. Consider the operating schedule, control requirements, site constraints, fuel or resource availability and backup strategy. A solar electricity proposal, for example, should not be treated as a direct replacement for a process-heat system without an engineered design.
Expert verification required: every utility figure, design margin, fuel conversion, water balance and safety or environmental requirement. No standard kW-per-TPD, water-per-tonne or fuel-consumption guarantee is assumed.
Common questions
Can I estimate utilities from TPD alone?
Not reliably. Product mass, process route, operating schedule, moisture removal and utility supply conditions must be defined.
Which number should a supplier provide?
Request connected, normal and peak demand, clearly labelled with units and operating conditions, plus the contractual basis for verification.
Sources and further reading
External references provide technical or regulatory context. They do not endorse PulpGuru or verify a proposed plant. Confirm current editions and requirements for your project.
Discuss your project requirements
Share your product list, location, feedstock plan and capacity basis so the first discussion can focus on your actual project.
Request a project consultation ↗Explore the related solutions hub ↗